For UK builders

The AI writing tool built for builders.

Extension quotes, stage-payment contracts, variation notes and sub-contractor coordination — written professionally in seconds. Free to download.

Free to start. No card required.

For builders

What Drafted writes for you.

Built around the messages a UK builder actually sends — extensions, refurbs, variations and the contracts that protect both sides.

Extension and refurb quotes

Itemise labour, materials, sub-trades and timeline in a clear quote the customer can actually understand. No more losing £40k jobs to better paperwork.

Stage-payment contracts

Plain-English contracts with deposit, first-fix, second-fix and final stage payments. Protects you when the job stretches.

Variation and extras messages

Customer wants to change the spec mid-job? Drafted writes the variation note with cost, time impact and a sign-off line.

Sub-contractor coordination

Quick, clear messages to plumbers, sparks and plasterers about start dates, access and dependencies. Less time on WhatsApp, more time on site.

Real examples

Type a few words. Get a full quote, contract or variation.

Quote example

You type

Single-storey rear extension. 4m x 5m. Brick and block, pitched roof, 2 rooflights, bi-fold door. Customer providing tiles. 8-week build.

Drafted writes

Hi Tom,

Thanks for the chat on site. Here's the quote for your rear extension:

Groundworks and foundations — £8,400
Brick and block walls (with cavity insulation) — £14,200
Pitched roof structure and tiling labour — £7,800
2x Velux rooflights (supplied + fitted) — £1,650
Bi-fold door (3-pane, supplied + fitted) — £4,950
Electrics (1st + 2nd fix, sub-contracted) — £2,400
Plastering and skim — £3,100
Waste, skip and site clean — £1,200

Total: £43,700 (excluding VAT)

Timeline: 8 weeks from start, weather permitting.
Payment: 10% deposit, weekly stage payments against work completed.

Happy to walk through any line you want clarified.

Danny

Variation note example

You type

Customer wants to upgrade kitchen flooring from laminate to engineered oak mid-job. Adds £1,800 materials and 2 days.

Drafted writes

Hi Tom,

Following on from this morning, here's the variation for the kitchen flooring change.

Original spec: Laminate flooring, 18m².
Updated spec: Engineered oak flooring, 18m².

Additional cost: £1,800 (materials only — no extra labour cost).
Timeline impact: +2 days, pushing handover from Friday 19th to Tuesday 23rd.

If you're happy to proceed, just reply confirming and I'll get the oak ordered today.

Danny
The quote tool saves me an hour every evening. Used the contract generator for a £25k extension last month — customer signed it the same day.

Danny O'Connell

Builder · Leeds

Explore

Built for every UK trade.

See how Drafted can help your business — wherever you sit in the trades.

Related trades

Other trades using Drafted.

Built for builders. Free to start.

Download Drafted and write your next extension quote, variation note or contract in seconds.

No credit card required